Mpp Power Pipe

MPP power pipe core is used for cable protection in power projects, especially suitable for trenchless buried laying of medium and low voltage cables of 10KV and below. It is the mainstream pipe material that replaces traditional cement pipes and steel pipes.
Send Inquiry
Description

Shanxi Kaisheng Plastic Co., Ltd. is one of the most reliable manufacturers and suppliers of mpp power pipe in China. Please feel free to buy CE approved mpp power pipe in stock here from our factory. All customized products are with high quality and competitive price. Contact us for quotation.

 

High Quality Chinese Plastic 3 Inch Orange Mpp Electrical Mpp Pipe for Ground Cable Protection

 

MPP power pipe core is used for cable protection in power projects, especially suitable for trenchless buried laying of medium and low voltage cables of 10KV and below. It is the mainstream pipe material that replaces traditional cement pipes and steel pipes.

product-1080-1080

 

Its specific applicable fields can be divided into the following categories:

 

 

- Municipal power grid construction:

underground cable pipe networks for urban roads and residential areas to solve the impact of road excavation on traffic and the environment.

- Industrial park power distribution:

Cable laying in factories and industrial parks, acid and alkali resistance and corrosion resistance are suitable for industrial environments.

- Transportation infrastructure:

Communication and power cable protection tubes along highways and railways can withstand the impact of external forces caused by roadbed settlement.

- Underground pipe gallery project:

As a special protection pipe for the power cabin in the comprehensive pipe gallery, it meets the stability requirements of long-term burial.

2. The mainstream of MPP power pipes adopts socket-type hot-melt connection. In trenchless construction scenarios, it is equipped with hot-melt butt connection. The core is to fuse the pipe ports through heating to form a sealed and strong whole.

 

The standard installation process is mainly divided into 5 key steps:

 

 

1. Pipe pretreatment:

A special cutting machine is required to cut the pipe to ensure that the end face is smooth and burr-free; clean the dust and oil on the port, and lightly polish the port surface with sandpaper to enhance the welding adhesion.

01

2. Hot melt preparation:

Set the temperature of the hot melt machine to 200-220°C (specifically adjusted according to the pipe specifications). After the temperature stabilizes, insert the pipe port and socket fitting into the heating die of the hot melt machine respectively, and heat for the preset time (usually 30-60 seconds, need to match the pipe diameter).

02

3. Butt fusion:

After heating is completed, quickly take out the pipe and fittings, align with the axis and insert forcefully to the marked depth, keep it stationary, and wait for natural cooling (cooling time is about 5-10 minutes, the larger the pipe diameter, the longer the cooling time). Rotation or movement is prohibited during this period.

03

4. Special steps for trenchless pipe jacking:

If trenchless pipe jacking is used, guide devices must be installed in the working wells at both ends first, and the MPP pipes shall be jacked section by section through a pipe jacking machine. When each section of pipe is connected, the hot melt process must still be followed to ensure that the interface is sealed.

04

5. Quality inspection:

After cooling, check whether there is a uniform welding ring at the interface. If there are no gaps or deformations, it is qualified; after all installations are completed, a pipe diameter test is required to ensure that the cable can be penetrated smoothly.

05

 

185a58793f64ce21106ee64556200947

760409b5fe6b8e09b98e37f1683e5b81

ba9c2f76ddb18cae4de0629c7849a4bc

 

Hot Tags: mpp power pipe, China mpp power pipe manufacturers, suppliers, factory, Mpp Power Pipe, mpp pipe